How to share the workload of a simulation across multiple cores
Posted: 27 Oct 2018, 15:29
Hi, I need to launch a simulation a very high number of times, so time is precious for me. Each time the V-REP is simulating only one of my cores is fully used while the others don't seem to be affected. There is some setting that I'm missing in order to allow V-REP to parallelize the workload of a simulation?
P.S. I use V-REP as a simulation environment for my project on neural networks. This means that each time I simulate I use a slightly different control on the actuators involved to train my neural networks. Running multiple simulations in parallel instead of a single parallelized simulation isn't unfeasible but I have to modify the algorithm that I'm using right now and I prefer of not doing so in an early stage of development.
P.S. I use V-REP as a simulation environment for my project on neural networks. This means that each time I simulate I use a slightly different control on the actuators involved to train my neural networks. Running multiple simulations in parallel instead of a single parallelized simulation isn't unfeasible but I have to modify the algorithm that I'm using right now and I prefer of not doing so in an early stage of development.